Hinkley chromium clean-up could take more than a century

HINKLEY • The Lahontan Regional Water Quality Control Board will be deciding soon if an expansion to the treatment of the chromium 6 water plume in Hinkley will be put into place, but residents probably won’t see the results in their lifetimes.

Pacific Gas and Electric is proposing to expand its current operation of injecting the chromium 6 tainted water with ethanol to convert it to the less dangerous chromium 3. In a feasibility study done by the water board, the ethanol treatment would probably take about 150 years to restore chromium 6 levels to the naturally occurring levels of 3.1 parts per billion.

The feasibility study done by the water board shows that the removal of the chromium 6 tainted groundwater will take more than 100 years, even with the most effective treatment.

PG&E is currently injecting ethanol into the plume in order to convert the chromium 6 into chromium 3, which is much less toxic. The company pumps contaminated water out and sprays it onto alfalfa plants so that it will not be spread through the air. PG&E also injects clean water as part of the program to cleanse the groundwater.

The expanded program will include increased pumping and will occur over a larger area, said Lauri Kemper, assistant executive officer for the Lahontan water board.

Read more…

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: